Displaying 148 - 168 of 256

    Provides guidance to use the Fire Safety Verification Method (FSVM) for buildings in NCC Volume One.

    08.2021 Handbook

    Provides guidance to develop or approve a scope of proposed remedial work to upgrade an existing building for multi-residential, commercial, industrial and public buildings.

    08.2021 Handbook

    Provides guidance on facilitating access to buildings for telecommunications services.

    08.2021 Handbook

    Fire Code Reform Centre (Project 6) This Technical Report, Analysis of USA Retail Fires, is a detailed analysis of statistics relating to retail fires.

    08.2021 Report

    This supporting documents assists in understanding the focus of changes being considered for the 2022 version of the National Construction Code (NCC 2022) in regards to:

    As part of the ABCB’s commitment to delivering an NCC that is user-friendly and modern, important changes are being implemented for the 2022 edition of the code.

    07.2021 Infographic

    Assists in understanding and applying Part J5.7, Pump System energy efficiency DTS Provisions.

    07.2021 Calculator

    Provides guidance to use the Verification Methods in NCC Volumes One and Two. It helps to understand methods used to assess structural robustness with practical examples.

    07.2021 Handbook

    Provides guidance on risks and equipment limitations when considering lifts as a Performance Solution.

    07.2021 Handbook

    Provides guidance to use these Verification Methods in NCC Volumes One and Two. It offers theory about structural reliability and the policy objectives of these Performance Requirements.

    07.2021 Handbook

    Provides guidance on warm water systems in NCC Volume Three for plumbing and drainage solutions.

    07.2021 Handbook

    This Guideline assists in developing a proposal to change the NCC. It describes the information that should be included when completing a Proposal for Change (PFC) form.

    07.2021 Template

    This report estimates the potential construction costs for an accessible adult change facility in an existing modified BCA facility or a separated facility as specified below:

    07.2021 Report

    This case study shows how to calculate the Total R-Value, including thermal bridging, for roof system in a Class 7 storage facility located in climate zone 6.

    07.2021 Case study

    This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 6 shop located in climate zone 3.

    07.2021 Case study

    This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 3 residential building located in climate zone 5.

    07.2021 Case study

    This discussion paper was released in April 2014, it informed and sought feedback from stakeholders on the resilience of new buildings to extreme weather events.

    07.2021 Paper

    Summary of changes The NCC will be amended out-of-cycle prior to NCC 2019. This document details the clauses affected due to NCC 2016, Volume One Amendment 1.

    This information brochure provides a summary of relevant information regarding the CodeMark Australia Certification Scheme

    07.2021 Infographic

    Advisory Note This Advisory Note relates to requirements for stairways, landings and ramps to have slip-resistant, non-skid or non-slip surfaces.

    07.2021 Advisory note

    Performance Solution scenario This Performance Solution Scenario has been developed to assist building practitioners in formulating Performance Solutions using a NABERS Energy Commitment Agreement.

    07.2021 Case study