Shows the performance-based design process when selecting fans based on system resistance and fan efficiency as part of the energy efficiency of a new retail building.
Shows a performance-based design process for the ventilation for a university building using adaptive thermal comfort and predicted mean vote (PMV) for energy efficiency.
Shows the performance-based design process for a house in a flood hazard area. It is recommended to read in conjunction with the Developing a Performance Solution process document.
This case study shows how to calculate the Total R-Value, including thermal bridging, for roof system in a Class 7 storage facility located in climate zone 6.
This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 6 shop located in climate zone 3.
This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 3 residential building located in climate zone 5.
Performance Solution scenario This Performance Solution scenario has been developed to assist plumbing practitioners in formulating Performance Solutions concerning high rise apartment stacks.
This Case Study outlines developing a DTS Solution for the energy efficiency of a small office building. It is based on the DTS Provisions in Section J of NCC Volume One.
Performance Solution scenario This Performance Solution Scenario has been developed to assist building practitioners in formulating Performance Solutions using a NABERS Energy Commitment Agreement.
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions concerning prevention of surface water entr
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions concerning weatherproofing.
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating a Performance Solution concerning energy efficiency of a Class 5
Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions using the Green Star - Design and As Built
This case study outlines the application of NCC Provision A2.2(4). It aims to demonstrate a practical application of the NCC Performance Solution process.