NCC 2022 Volume Two - Building Code of Australia Class 1 and 10 buildings
Search the National Construction Code editions
H7
Part H7 Ancillary provisions and additional construction requirementsPart H7 Ancillary provisions and additional construction requirements
A barrier must be provided to a swimming pool and must—
H7P1 only applies to a swimming pool with a depth of water more than 300 mm, in conjunction with the Swimming Pools Act 1992 and the Swimming Pools Regulation 2018.
NSW H7D2(1) applies in New South Wales to the technical construction requirements for barriers to restrict access to swimming pools, subject to—
The Swimming Pools Act 1992 and the Swimming Pool Regulation 2018, applicable to swimming pools with a depth of water of more than 300 mm, regulate the circumstances in which a barrier is required and prevail in the case of any inconsistency.
Definition of ‘swimming pool’
The NCC definition of swimming pools is specific in including a bathing or wading pool and a spa. The requirements of AS 1926.3 apply to all types of pools defined as swimming pools under the NCC, irrespective of the definition in the Standard.
Water recirculation systems
The swimming pool water recirculation system requirements seek to minimise the risk of entrapment or injury of people using the swimming pool and provide for the safe operation of skimmer boxes and outlet systems.
Additional requirements
In addition to the requirements of this Part, a swimming pool must comply with the structural requirements of other Parts of NCC Volume Two and the ABCB Housing Provisions. The structural requirements refer to the swimming pool being designed and constructed to withstand any combinations of loads and other actions to which it may reasonably be subjected and the structural resistance of the materials and forms of construction used in the swimming pool.
Cross-volume considerations
Part C2 of NCC Volume Three sets out the requirements for pumped discharge from swimming pools.
In New South Wales, buildings subject to BAL-FZ must comply with specific conditions of development consent for construction at this level.