Delete clause H1D10 and insert VIC H1D10 as follows:
(1) Performance Requirement H1P2 for Class 1 buildings constructed in a flood hazard area is satisfied if the building is constructed in accordance with the ABCB Standard for Construction of Buildings in Flood Hazard Areas.
(2) The definitions of flood hazard area and freeboard in the ABCB Standard for Construction of Buildings in Flood Hazard Areas are replaced with those in Vic Schedule 1.
(3) The definition of defined flood level in the ABCB Standard for Construction of Buildings in Flood Hazard Areas is replaced with that in Schedule 1.