NCC 2022 Volume Three - Plumbing Code of Australia
Search the National Construction Code editions
E4
VIC Part E4 Stormwater - Surface and sub-surface drainage systemsVIC Part E4 Stormwater - Surface and sub-surface drainage systems
This Part sets out the requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a surface drainage system to the point of connection.
Objectives
The Objective of this Part is to—
Objective
Functional Statements
Buildings and their surroundings are to be provided with a surface drainage and subsurface drainage installation and be constructed in such a manner as to provide protection for people, property and the environment from the adverse effects of stormwater.
Functional statement
Performance Requirements
Surface drainage systems
Design, construction and installation
Deemed-to-Satisfy Provisions
Performance Requirements E4P1 to E4P2 are satisfied by complying with E4D2.
Application
The design, construction, installation, replacement, repair, alteration and maintenance of surface and subsurface drainage systems must be in accordance with AS/NZS 3500.3.
General requirements