VIC Part E3 Stormwater - Roof drainage systems
Introduction to this Part
This Part sets out the requirements for the design, construction, installation, replacement, repair, alteration and maintenance of any part of a roof drainage system
NCC Blurbs
The Objective of this Part is to—
- safeguard people from illness, injury or loss (including loss of amenity) due to the failure of a roof drainage installation; and
- ensure that a roof drainage installation is adequate; and
- conserve water and energy; and
- safeguard the environment; and
- safeguard public and private infrastructure; and
- ensure that a roof drainage installation is designed and is capable of being maintained so that throughout its serviceable life it will continue to satisfy Objectives (a) to (e).
NCC SPTC Current
Objective
NCC ID
_8017a80f-7ebc-4126-8bb2-dfe3e741ce01
NCC Blurbs
Buildings are to be provided with a roof drainage installation constructed to provide protection for people, property and the environment from the adverse effects of stormwater.
NCC SPTC Current
Functional statement
NCC ID
_92df2b59-bfa6-4304-b562-4075e07fbf70
NCC Blurbs
A roof drainage system must dispose of stormwater flows from rainfall events having an average recurrence interval appropriate to:
- The importance of the building.
- The severity of potential damage to property, loss of amenity, illness or injury that would result from the failure of the system.
NCC SPTC Current
Roof drainage systems
NCC ID
_000b0297-c288-4a50-aaa9-66e935203697
NCC Blurbs
A roof drainage system must provide an overflow device to transfer stormwater flows generated by extreme rainfall events.
NCC SPTC Current
Overflow
NCC ID
_9a61bdac-7c8d-42ae-a45d-42a6aa638355
NCC Blurbs
All internal roof drainage components must be watertight.
NCC SPTC Current
Watertightness
NCC ID
_9f0c21ed-c3eb-4d34-abcc-feb68075d121
NCC Blurbs
(1) A roof drainage system must ensure the following—
- Stormwater is transferred to a point of connection.
- Access for maintenance and clearing blockages.
NCC Title
Design, construction and installation
NCC SPTC Current
Design, construction and installation
NCC ID
_0fb27a91-2baa-476d-9575-bb54ec513b39
Deemed-to-Satisfy Provisions
NCC SPTC Current
Application
NCC ID
_ca341f79-7cf2-4ba5-8619-ac76d3ec07a8
NCC Blurbs
The design, construction, installation, replacement, repair, alteration and maintenance of a roof drainage system must be in accordance with AS/NZS 3500.3 and SA HB 39, subject to following:
- Insert Clause 4.9.6.3 Fastening in AS/NZS 3500.3 as follows: Dowpipes to be securely fastened to walls and structures so as to withstand movement due to thermal expansion or weight due to a partial or total blockage, and
- Where there are any conflicts between AS/NZS 3500.3 and SA HB 39, AS/NZS 3500.3 prevails.
NCC SPTC Current
General requirements
NCC ID
_f535ff78-7a62-4beb-8d30-5eb86d44cdb6