Delete clause C3P5 and insert TAS C3P5 as follows:
On-site wastewater management systems that facilitate on-site storage, treatment, disposal or re-use of wastewater must be designed and constructed—
- with required treatment and storage capacity for the volume and make up of waste and frequency of discharge for disposal; and
- with required size, strength and rigidity for the nature, flow rates, volume of wastes and/or waste products which must be processed; and
- using materials which are impervious both to the waste for which disposal is required and to water; and
- to avoid the likelihood of surface water and stormwater entering the system; and
- so that access or inspection openings provided for desludging and maintenance terminate at or above finished surface level.
- so that the installation throughout its serviceable life will continue to satisfy the requirements of C3P1 to C3P9.
Explanatory information
For alternative venting arrangements, see clause C2D6 in sanitary drainage.