Displaying 127 - 147 of 217

    This case study shows how to calculate the Total R-Value, including thermal bridging, for roof system in a Class 7 storage facility located in climate zone 6.

    07.2021 Case study

    This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 6 shop located in climate zone 3.

    07.2021 Case study

    This case study shows how to calculate the Total R-Value, including thermal bridging, for a wall system in a Class 3 residential building located in climate zone 5.

    07.2021 Case study

    This discussion paper was released in April 2014, it informed and sought feedback from stakeholders on the resilience of new buildings to extreme weather events.

    07.2021 Paper

    This Advisory Note explains the intent of the concessions in Specification C1.1, Clauses 3.10(a) and 4.3 (a) of NCC Volume One.

    07.2021 Advisory note

    Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating Performance Solutions using the Green Star - Design and As Built

    07.2021 Case study

    Advisory Note This Advisory Note relates to requirements for stairways, landings and ramps to have slip-resistant, non-skid or non-slip surfaces.

    07.2021 Advisory note

    Summary and Instructions The NCC was amended out-of-cycle prior to NCC 2022. NCC 2019 Amendment 1 includes:

    This report shows the results of a number of building models that compare the energy, cost and greenhouse gas emission reductions of buildings built to Deemed to Satisfy provisions of Section J NCC

    07.2021 Report

    This paper investigates the fatigue performance of the battens using analysis methods applied in studying cladding fatigue.

    07.2021 Report

    This information brochure provides a summary of relevant information regarding the CodeMark Australia Certification Scheme

    07.2021 Infographic

    This Regulation Impact Statement (RIS) was prepared to incorporate the proposed amendments to the Australian Standard AS 3959-1999 Construction of buildings in bushfire prone areas (the Standard),

    At its meeting on 19 February 2016, the Building Ministers’ Forum agreed to the development and implementation of a range of measures to help address risks associated with high risk cladding produc

    07.2021 Advisory note

    Performance Solution scenario This Performance Solution Scenario has been developed to assist building practitioners in formulating Performance Solutions using a NABERS Energy Commitment Agreement.

    07.2021 Case study

    Summary and Instructions The NCC was amended out-of-cycle prior to NCC 2022. NCC 2019 Amendment 1 includes:

    This Case Study outlines developing a DTS Solution for the energy efficiency of a small office building. It is based on the DTS Provisions in Section J of NCC Volume One.

    07.2021 Case study

    Report This report outlines the principles and methodology used to develop the proposed residential heating and cooling load limits for all Nationwide House Energy Rating Scheme (NatHERS) climate z

    07.2021 Report

    Performance Solution scenario This Performance Solution scenario has been developed to assist building practitioners in formulating a Performance Solution concerning energy efficiency of a Class 5

    07.2021 Case study

    Summary of changes The NCC will be amended out-of-cycle prior to NCC 2019. This document details the clauses affected due to NCC 2016, Volume One Amendment 1.

    This final decision Regulation Impact Statement considers a further five proposals that were developed with assistance of the Emergency Egress Forum.

    This Advisory Note relates to requirements to protect certain openable windows to reduce the risk of young children falling from those windows.

    07.2021 Advisory note