This report summarises the process and outputs developed in response to the Building Confidence Report.

Report

This macro-economic analysis was commissioned by the ABCB to inform the development of responses to the Building Confidence Report.

Report

This report estimates the potential construction costs for an accessible adult change facility in an existing modified BCA facility or a separated facility as specified below:

Report

This Public Report provides a progress update on delivery of the Building Confidence Report (BCR) National Framework by the ABCB's BCR Implementation Team, up to December 2020.

Report

This Public Report details progress on delivery of the Building Confidence National Framework by the ABCB’s Building Confidence Report Implementation Team, up to May 2021.

Report

The Accessible Housing Options Paper ('Options Paper') has been developed by the ABCB to provide a preliminary menu of options and costings on the possible inclusion of a minimum accessib

Report

Fire Code Reform Centre (Project 4) This Technical Report, The Probability of Death in the Room of Fire Origin: an Engineering Formula, involved the development of a Fundamental Model, incorporatin

This paper investigates the fatigue performance of the battens using analysis methods applied in studying cladding fatigue.

Consultation Report This report documents, in summary form, stakeholder feedback on the Accessible Housing Options Paper.

Monash University Accident Research Centre was commissioned by the ABCB to undertake a study of the incidence of slips, trips and falls and their relationship to the design and construction of buil

Public Report This Public Report details the progress in the delivery of the Building Confidence Report (BCR) National Framework by the ABCB's BCR Implementation Team.

Fire Code Reform Centre (Project 2) This final submission, Fire Performance of Materials - Wall and Ceiling Lining Materials, was undertaken to confirm the need for regulatory control and identify

Fire Code Reform Centre (Project 3)This report, Fire Resistance and Non-Combustibility - Room and Furnace Tests of Fire Rated Construction, provides support for the calculation procedures used to a

Fire Code Reform Centre (Project 6) This Technical Report, Simulated Shopping Centre Fires in Retail Buildings, was aimed at studying the factors affecting fire safety in shopping centres with the

Appendices 1-8 This document contains the appendices that are referred to in the Scoping study of Condensation in Residential Buildings.

This report shows the results of a number of building models that compare the energy, cost and greenhouse gas emission reductions of buildings built to Deemed to Satisfy provisions of Section J NCC

The analysis is presented in a summary table for each building Class and type.

This document is a summary of the research findings undertaken by Di Marzio Research, which was designed to identify the impact of the proposed BCA changes to the riser and going dimensions of stai